PROJECT/
LOCATION
|
PILE APPLICATION/
STRUCTURE |
BENEFIT / ADVANTAGE |
CONTRACTOR |
STRUCTURAL
ENGINEER
|
GEOTECHNICAL
ENGINEER |
OWNER |
|
1.
Caltrans Alternate Pile Test Program
San Francisco
Tubex piles
|
Various conventional and specialty
piles installed to shallow and deep tip elevations at deep bay mud site over Colma sand 14x0.500/22" -- 1200 kip test
|
Tubex pile shown to outperform
other piling systems in extensive
testing program.
Caltrans approved use of Tubex piles.
(Reference DFI/Caltrans Report, September 1993)
|
FUNDEX
|
CALTRANS
|
CALTRANS
|
CALTRANS
|
|
2.
Bent 31, Rte.280
San Francisco
Tubex piles
|
Low Overhead retrofit of I-280
Seismic retrofit of viaduct.
16x.344/22" 1862 LF/49EA
150 ton pile
|
-Low overhead (20' clearance)
-Avoided noise adjacent to occupied
office
- med. sands/Bay mud over dense sand
-originally designed w/ driven pipe pile |
GUY F.
ATKINSON
|
CALTRANS
|
CALTRANS
|
CALTRANS
|
|
3.
Knox SRO(6th & Tehama)
San Francisco
Tubex piles
|
Medium sand over dense Colma sands
Condominium project adjacent to vibration-sensitive building
16x.375/22" 13,800 LF/178 EA.
95 ton pile/45 ton tension
|
-reduced number of driven piles
-avoided noise/vibration at approx. same cost and duration
-load test performed
|
CAHILL
CONTRACTORS
|
OLMM
|
TRANSPACIFIC
GEOTECHNICAL
ENGINEERS
|
KNOX
|
|
4.
Bay Bridge Test Program
Oakland
Tubex piles
|
Pilot test program for specification
development for SF-O bay Bridge
Retrofit to verify constructability
and pile capacities for retrofit design
900 LF/15 TESTS
(Ref: SFOBB Materials Information Report)
|
-liquefiable fills over Bay Mud
-installed in simulated low-overhead
-extensive test program incl. lateral
compression and tension-satisfactory performance resulted in
sole specification for retrofit project
|
AMERICAN
PILEDRIVING
INC
|
CALTRANS
|
CALTRANS
|
CALTRANS
|
|
5.
Lakeside
Oakland
Tubex piles
|
Low-overhead pile adjacent to BART and Laney College Oakland Campus
Deep Force sewer project
16X.344/22" 912 LF19 EA.
200 TON PILE
|
-was substituted for driven 18" PC
after major constructability issues
-no vibration to BART system permitted
-PC were to be set in drilled holes to
mitigate vibration near. BART tunnel
-Tubex more cost effective
-no noise disturbance to Laney College |
MOUNTAIN
CASCADE
INC.
|
CH2MHILL
|
DAMES & MOORE
|
CITY OF OAKLAND
|
|
6.
Jack London Theater
Jack London Square, Oakland
Tubex piles
|
Replaced driven PC piles adjacent
to unreinforced masonry building
Tubex Piles driven same depths as PC
piles
16X.344/22" 20EA/560 LF
175 TON PILE
|
-significant concern with adjacent
unreinforced structure due to
vibration of piledriving
-closest 2 rows of columns supported
by Tubex pile/remaining pile were driven
|
M.A. LINDQUIST
COMPANY
|
ROZANNO &
TOVANNI
|
HARZA
|
JACK LONDON
THEATER
ASSOCIATES/
PORT OF
OAKLAND
|
|
7.
Richmond Parkway
Richmond
Tubex piles
|
Replaced driven 95' 70 ton 14" piling at the abutment and last bent of the
major viaduct on the Richmond Pkwy
18x.500/26" 101 ea/3535 LF
350 kip load tested <.4" deflection.
|
-Subsurface contamination avoided by
shortening Tubex pile @ same capacity
-residual contaminants grouted in situ
-competitively bid against soil mixing
-driven pile not allowed due to contamination.
-friction pile design
(Ref: Richmond Pkwy Report) |
BENCO
|
BECHTEL ENGINEERING
|
HARZA
|
CITY OF RICHMOND
|
|
8.
Cypress Mitigation Power Source Equipment
Enclosure Structure
Oakland
Tubex piles
|
Specified as 100 ton for
protective structure for EBMUD
generators
Specified based on Tubex performance
on Lakeshore and Lakeside projects &
recommended by CH2MHill
18X.344/26" 35 EA./ 3000 LF
|
-Equipment extremely vibration sensitive
-no outages resulted from work
-no shut-downs were required
-very confined space problem solved
|
D.J. AMOROSO
CONSTRUCTION
|
JOHN CAROLLO ENGINEERS
|
GEO/RESOURCE CONSULTANTS
|
EBMUD
|
|
9.
Basin 54/Lakeshore
Oakland
Tubex piles
|
Specified for 2nd phase of previous
Lakeside Project
Pipe saddle supports for force sewer
16X.344/22" 40 EA/3800 LF
100 TON PILE
|
-20 ' overhead clearance under I-880 -avoided noise to Laney College
-achieved required capacity
|
MOUNTAIN
CASCADE
INC.
|
CH2MHILL
|
DAMES &
MOORE
|
CITY OF
OAKLAND
|
|
10.
San Francisco-
Oakland Bay Bridge Retrofit
Oakland
Tubex piles
|
Specified for low-overhead, vibration
free piles under approach ramp
structure
12' min. to 17' max. clearance
Conventional drillers & piledrivers
not interested in job due to access
20X.500&1"/26" 173EA/13000 LF |
-extremely confined site
-low overhead
-vibration free/liquefaction
-high lateral capacity pile
-every pile proof tested in tension
-excellent QC/consistency demonstrated
-high lateral loads on piles
|
BALFOUR
BEATTY
CONSTRUCTION
|
CALTRANS
|
CALTRANS
|
CALTRANS
|
|
11.
Chevron Research Bldg. Seismic Retrofit
Richmond
Tubex piles
|
Seismic retrofit of research bldg.
13' clearance under overhangs
Piles rocket-socketed into shale.
100 TON/75
TON TENSION
16X.312/22" 20 EA/1000 LF
|
-retrofit of research lab/ piledriving noise unacceptable
-originally specified pin pile
-Tubex more cost effective
-rock socket required/ 50 ft piles
|
OVERAA
CONSTRUCTION
|
CHEVRON
|
DAMES & MOORE
|
CHEVRON
|
12.
SFIA ART Load Test
San Francisco
International Airport
Tubex piles |
Test pile for capacity and feasibility
for ART footing
(Ref: SFIA LRT test program Report)
400 kip tension load test
|
-high tension/ compression loads
-confined access
|
CALIFORNIAN
PILE
FOUNDATIONS
|
PARSON
BRINCKERHOFF
WONG LUSTER
|
KLEINFELDER
|
SFIA
|
|
13.
Terminal #2
Oakland International Airport
Tubex piles
|
Expansion of terminal 2 partially
underneath tubular space frame
truss structure
16X.500/22" 13 EA/900 LF
35 TON - 100 PILE (VARIED)
|
-exposure to public, into secure area
-some piles in low overhead due to truss
-specified as driven pipe project
-alternate bid project against
driven pipe pile cost effective |
VITTON
CONSTRUCTION
|
JF JORDAN
|
GEOMATRIX
|
PORT OF OAKLAND
|
|
14.
Bayview Sr. Housing
San Francisco
Tubex piles
|
5-story senior residence bldg.
in neighborhood location
Adjacent to antique warehouse
16X.375/22" 63 EA/1800 LF
Load tested to 1100 kips & held
Used 175 ton working load/25' piles
|
-Competitively bid as 1:2 substitution vs.driven 12" piling. Noise was major concern to neighborhood groups
-GC concerned w/vibration, litigation
-High Capacity short piles
(Ref: Bayview Compression Test Report) |
NIBBI BROTHERS
GENERAL
CONTRACTORS
|
ACKLAND
INTERNATIONAL
|
TRANSPACIFIC
GEOTECHNICAL
ENGINEERS
|
HUD/CITY
OF
SAN
FRANCISCO
|
|
15.
39 Drumm Street
San Francisco
Tubex piles
|
5 -story office and seismic retrofit
in extremely confined space. Deep Bay Mud, unreinforced masonry buildings,
downtown location. Luxury hotel
directly across street.
90 TON PILE/ 54 EA/5700 LF
|
-adjacent unreinforced masonry buildings.
-site too small to drive 115' PC pile
-extremely small site (35' x 120')
-vibration, noise prohibited
-75' of bay mud/ 104' piles
-no nuisance complaints received
(Ref: Drumm Street Case History Report) |
TRANSWORLD
CONSTRUCTION
|
LAU KWON
ASSOCIATES
|
GEO/RESOURCE
CONSULTANTS
|
LEE
DEVELOPMENT
|
|
16.
North Connector
5500J Utility Tunnel
San Francisco
International Airport
Tubex piles
|
Piles for utility tunnel under terminal loop road; Maintain road open to traffic pile required. Seated into rock.
300 TON/60 TON (T) 44EA/2350 LF
Originally specified as pin pile
Tubex significant cost savings |
-high tension/compression into rock
-10.5 ft. clearance inside 25' cofferdam
-competitively bid against specified micro pile
-load tested in compression & tension
-22- hour shifts/day
(Ref: North Connector Load Test Report)
|
DILLINGHAM INCORPORATED
N.A.
|
KENNEDY/JENKS
|
PSC ASSOCIATES
|
SFIA
|
17.
Delta Boarding
Dock C
San Francisco
International Airport
Tubex piles |
Repairs to loading docks at Boarding
Area C. 100 ton capacity/ 100 ft.
12 EA/1200 LF
16X.312/22"
|
-exposure to air traffic/secure area
-competitively bid against driven pipe
-avoided use of boom in air/hazard
-very close to boarding area windows
and passenger jet ways
|
McCARTHY
BROTHERS
CONSTRUCTION
|
HK&A
|
KLEINFELDER
|
DELTA
AIRLINES
|
|
18.
California College of
Arts and Crafts
San Francisco
Tubex piles
|
Seismic retrofit piles inside of existing warehouse (30 ft clearance)
16X.312/22" 20 EA/900 LF
100 kip T=C
|
-competitive bid against drilled piers
-owner occupied site: no noise
-very dense Colma sand
-30 ft headroom/40 ft piles
-shorter piles of same capacity |
OLIVER &
COMPANY
|
OVE ARUP &
ASSOCIATES
|
KLEINFELDER
|
CCAC
|
|
19.
Duncan Hall
San Jose State
University
San Jose
Tubex piles
|
Seismic retrofit- addition of shear
walls under cantilevered structure
Required penetration through v. dense
gravel. 13 ft of overhead clearance
16x.500/22" 20 EA/1320 LF
365 kips T=C (seismic) |
-competitively bid against driven pipe
-very dense gravel and sands
-shorter piles vs. driven
-no noise to classrooms/classes in session
-13 ft headroom/80+ ft piles
-driven piles could not penetrate
denser lower strata
|
ALBAY
CONSTRUCTION
|
DEGENKOLB
|
WOODWARD-
CLYDE
CONSULTANTS
|
SAN JOSE
STATE
UNIVERSITY
(CAL. STATE)
|
|
20.
California College of
Arts & Crafts Phase II
San Francisco
Tubex piles
|
Seismic retrofit piles inside of existing
warehouse (25 ft clearance)
Second Phase
16X.312/22" 6 EA/245 LF
100 kip T=C
|
-client satisfied w/Phase I
-owner occupied site: no noise
-very dense Colma sand
-25 ft headroom/40 ft piles
-classes in session during construction
|
OLIVER &
COMPANY
|
OVE ARUP &
ASSOCIATES
|
KLEINFELDER
|
CCAC
|
|
21.
San Mateo County
Office Building
Redwood City
Tubex piles
|
New utility tunnel pile placed 3 feet
from occupied building during normal
working hours. Replaced 14" pile to
vibration, public exposure. Main power feed electrical vault w/seismic trips with in 2 feet of pile.
175 TON/4 EA/245 LF |
-contractor initiated change from driven
-vibration damage to facade concerns
-noise avoided in public pass-though
-permitted normal hours w/Tubex
-very high public expose location
-vibration sensitive equipment
|
TURNER
CONSTRUCTION
CO.
|
DASSE
|
KLEINFELDER
|
COUNTY OF
SAN MATEO
|
|
22.
California College of
Arts & Crafts Phase III
Logan Exhibit Hall
San Francisco
Tubex piles
|
Piles inside existing warehouse
w/25 ft clearance for new mezzanine
exhibit area
3rd phase of warehouse work.
100 kip (Tension & Compression)
|
-client pleased w/ previous phases
-seismic retrofit & noise restriction
-very dense Colma sand
-25 ft headroom/40 ft piles
-classes in session during construction
|
OLIVER & COMPANY
|
OVE ARUP & ASSOCIATES
|
KLEINFELDER
|
CCAC
|
|
23.
101 2nd Street Tower
(2nd & Mission)
San Francisco
Tubex piles
|
High capacity piles adjacent to masonry buildings bordering site
Drilled through very dense sands for increased capacity.
16x.312/22" & 20x.375 /26"
200 ton & 350 ton pile working loads
|
-Project also featured driven piles in addition to Tubex piles
-Competitively bid against drilled shafts
-Eliminated vibration concerns
-Tubex was unrestricted by downtown noise ordinances
Featured in Construction Link's April 1999 issue of Top 50
Projects for 1998-1999 |
DINWIDDIE
CONSTRUCTION
|
MIDDLEBROOK
+ LOUIE
|
DAMES &
MOORE
|
MYERS 2ND
ST. PARTNERS
|
|
24.
Hotel Sofitel
Redwood Shores
Redwood City
Tubex piles w/PLT used
|
Piles for new hotel addition in
front of existing lobby.
16x.312/22"
Capacity verified with Fundex PLT
175 ton pile |
-Selected over driven pile to avoid noise disturbance to hotel guests
-Higher pile capacity = reduced number of piles required
|
SWINERTON & WALBERG
|
WATRY DESIGN GROUP
|
CONSOLIDATED ENGINEERING LABORATORIES
|
MIOTEL / ACCOR
|
|
25.
Wax Museum of Fisherman's Wharf
Featured in Construction Link May 1999 issue
San Francisco
Tubex piles
|
Piles for Wax Museum in extremely
congested public site in the heart of Fisherman's Wharf. 16x.312/22" 155 ton pile
|
-Selected over driven pile to avoid noise & vibration disturbances to neighborhood
-Higher capacity / reduced number of piles
(Ref: Wax Museum Load Test Report) |
NIBBI BROTHERS |
NISHKIAN & ASSOCIATES |
TREADWELL & ROLLO
|
RONALD FONG INVESTMENTS |
|
26.
Disney ABC7 Studios
Glendale
Tubex piles
|
High capacity piles adjacent to operating studio sets
Contaminated site, High Lateral loads.
16x.312/22" and 16x.500/22"
175 ton pile |
-Avoidance of piledriving noise critical
-Contaminated site and caving sands
precluded drilled shafts
-Tubex avoided spoil offhaul & noise
-300 Tubex pile replaced over 600 PC piles
(Ref: ABC7 Load Test Report) |
DINWIDDIE CONSTRUCTION |
NABIH YOUSSEF & ASSOCIATES |
DAMES & MOORE |
DISNEY |
|
27.
Mokelumne Aqueduct
Stockton
Fundex Piles
|
Fundex piles: true cast in place
vibration free displacement piles
installed adjacent to operating
aqueduct
50 ton service load
Featured in ENR February 1999 issue |
-Avoidance of all vibration critical
-25' deep cofferdam/piles in peat & sand
-Competitively bid against augercast
Steel casing is extracted as pile is built
Load tested to 100 ton -1/4" deflection |
MOUNTAIN CASCADE INC. |
CH2MHILL |
GEI |
EBMUD |
|
28.
UAL Sludge Processing
Facility United Airlines
San Francisco International Airport
Tubex piles
|
Low-profile pile installation in tight access area for sludge processing facility upgrades
16x.312
50 ton service load |
-Piles within Airfield Operations Area;
installed with low profile Tubex machine to remain clear of flight path
-piles installed in tight mechanical area |
GORDEN PRILL |
GORDEN PRILL |
EARTH SYSTEM CONSULTANTS |
UNITED AIRLINES MAINTENANCE |
|
29.
Office Max
Alameda
PLT Compaction
|
Dynamic Compaction
Low-frequency, heavy weight
dynamic compaction of 15 ft of
liquefiable sand at gas station site
Utilized Fundex PLT Machine
|
-lowest costs versus all alternatives:
compaction grouting, chemical treating excavation & backfill or stone columns
-High water table, loose sands
-Tripled N values of sand up to 18' deep |
CALHOUN BROTHERS EXCAVATION |
CH2MHILL |
KLEINFELDER |
OFFICE MAX |
|
30.
LRT Bent 106
San Francisco International Airport
PLT test
|
Pile Load Test
Testing of suspect piles using Fundex
PLT machine. Provided a fast, reliable and economic analysis of previously driven 24" pipe pile |
-Allowed engineer to confirm capacity of piles that experienced "soft" resistance
-Fast, economical test to 760 kips
-Avoided costly construction delay that a standard compression test would have caused. |
SFIA |
PGH WONG / PARSON BRINKERHOFF |
PSC ASSOCIATES |
SFIA |
|
31.
California Paper Company
Santa Clara
PLT test
|
Pile Load Test
Tested "bottom drop" pipe piles using Fundex PLT machine.
to enable foundation contractor to
accurately bid project |
-Allowed engineer to confirm capacity of piles to design for project
-Fast, economical test to 700 kips
-cost and space prohibited conventionaL tests |
FOUNDATION CONSTRUCTORS INC. |
JACOBS ENGINEERING |
KANE GEOTECHNICAL |
CALIFORNIA PAPER |
|
32.
Pump Station II
Sacramento
PLT test
|
Pile Load Test
Testing auger-cast piles using
Fundex PLT machine. |
-Allowed engineer to confirm capacity of several test piles
-Static test also performed; test results of PLT showed excellent correlation to static test |
MIZAK
CONSTRUCTION
KIEWIT PACIFIC-Gen Contractor
|
ULF WERNER ASSOCIATES |
AGS |
SACRAMENTO MUD |
|
33.
Digital Think III
San Francisco
Tubex piles
|
Piles inside existing warehouse and
office space for conversion to new
offices space and mezzanine for
high tech firm
100 kip (Tension & Compression) |
-client partially occupied building
-clearances as low as 9'8"
-seated into very dense Colma sand
-40 ft piles |
DPR CONSTRUCTION |
TOM CHRISTIAN SE |
KLEINFELDER |
DIGITAL THINK |
|
34.
Chiron
Emeryville
Tubex piles
|
Exterior seismic support frames for exiting occupied building
seismic retrofit
Contaminated soils.
380 kip tension |
-CIDH prohibited due to subsurface
contamination
-competitively bid
-friction piles; hazardous soils
were encapsulated by full length grouting |
LEM CONSTRUCTION INC.
|
HKA |
TREADWELL & ROLLO |
CHIRON |
|
35.
Red Line MTA
Universal Terrace
Overcrossing
Studio City, CA
Tubex piles
|
High capacity piles adjacent to
Universal Studios in residential area
Rock-socketed, High Lateral loads.
20x.375 and 20 x.625 structural pipe
200 ton piles/125 ton tension
|
-Avoidance of piledriving noise critical
-Replaced H-pile on a 1:2 basis
-Caltrans Alternate Pile Specification
-Tubex avoided spoil offhaul & noise
-Performance test Program and extensive lateral testing demonstrated excellent axial & lateral capacity
(Ref: MTA Universal Axial & Lateral Load Test Report)
|
BRUTOCO ENGINEERING & CONSTRUCTION |
PARSONS - BRINKERHOFF
DMJM
JACOBS ENG. |
CONVERSE
CONSULTANTS
Tubex Consultants:
KLEINFELDER
DAMES & MOORE
LYMOND REESE
|
LOS ANGELES
METROPOLITAN
TRANSPORTATION
AUTHORITY (MTA)
|
|
36.
Yerba Buena Lofts
San Francisco
Tubex piles w/PLT used
|
Mid-to-High capacity piles for
new multi-story condo, in noise
restricted downtown area
Verified capacity with Fundex PLT
150-180 ton piles |
-Avoidance of piledriving noise critical
-high water table and caving sands
-Tubex avoided spoil offhaul & noise
-457 Tubex pile replaced over 700 PC piles
(Ref:Yerba Buena Lofts PLT Load Test Report) |
PANKOW
RESIDENTIAL
BUILDERS LP |
WATRY
DESIGN GROUP |
KLEINFELDER |
YBL LLP
(TANSEV-STARWOOD) |
|
37.
Camp Pendleton USMC
Automated Warehouse
Pendleton USMC Base
Tubex Piles
|
70 -ton Tubex piles for
warehouse addition.
Automated robotic plant in operation
mandated no vibration pile installation |
-Avoidance of piledriving vibration
-dense dry running sands
(Ref: Pendleton Load Test Report)
|
C.E. WYLIE
CONSTRUCTION |
KMA
DESIGN GROUP |
PSI
(PROFESSIONAL
SERVICES INC) |
UNITED STATES DEPT.
OF THE NAVY
US MARINE CORPS. |
|
38.
Bay Street Building
Complex
Emeryville
PLT test
|
Pile Load Test
15 PLT tests on 16" PC/PS concrete
piles. Test program completed in
2 days.
Conventional tests too costly |
-Allowed engineer to confirm capacity
of all test piles saving over $550,000 in pile costs
-PLT confirmed calculated capacity
-Time sensitive lot: all testing in 2 days |
SWINERTON &
WALBERG
|
|
KLEINFELDER |
|
|
39.
San Jose State University
Joint Library
San Jose, CA
Tubex piles
|
Piles adjacent to operating research
laboratory.
Used 16x.312 with 22-inch boring tip
90 ton piles/45 ton tension |
-Avoidance of piledriving vibration critical
-Replaced selected 16" PC piles 1:1
-SJSU specified based on previous Tubex pile performance on campus
-Balance of the project used driven 16" piles |
HENSEL PHELPS
CONSTRUCTION
COMPANY |
FORELL / ELSESSOR
ENGINEERS/
CARRIER JOHNSON
|
WOODWARD
CLYDE |
SJSU AND SAN JOSE
REDEVELOPMENT
COMMISSION |
|
40.
Building 160 Retrofit
Wallenberg Hall
Stanford, CA
Tubex piles
|
Mid-to-High capacity piles for seismic retrofit and space conversion inside 1896 historic sandstone 5-story structure (National Register Historic Structures) |
-Avoidance of piledriving vibration critical
-low overhead inside existing structure
-Tubex avoided spoil offhaul & noise
-installed pile in basement from main floor level using shoring towers
-piles dual purpose: bracing and load bearing |
HATHAWAY
DINWIDDIE
CONSTRUCTION
COMPANY |
STRUCTURAL
ENGINEERS
INC. (SEI) |
LOWNEY & ASSOC. |
STANFORD
UNIVERSITY
REGENTS
|
|
41.
211 Jefferson Street
San Francisco, CA
Tubex piles
|
90 ton piles in heart of Fisherman's
Wharf. Very poor soil conditions.
Tubex piles designed to tip in
thin bearing layer to achieve capacity
Tested 10% of all piles with Fundex
PLT to confirm capacity.
90 ton piles/45 ton tension |
-Avoidance of piledriving noise and
disturbance to tourism, and adjacent
building subject to vibration damage.
-Awarded Tubex after bid process and research by engineer and owner.
(Ref:211 Jefferson PLT Load Test Report)
|
McCARTHY |
PARADIGM |
DAMES & MOORE |
VENYSTATE INC. |
|
42.
524 Howard St. Load Test
Test Pile Program
San Francisco, CA
Tubex piles
|
180 ton capacity test piles for proposed building on very narrow lot with adjacent vibration sensitive structures. |
-Avoidance of vibration and noise critical
-very tight site with 200 piles
-Tubex avoided spoil offhaul & noise
-installed pile from basement grade |
SWINERTON &
WALBERG |
SKILLING WARD
MAGNUSSEN |
TREADWELL &
ROLLO |
HIGGENS DEVELOPMENT |
|
43.
UC Berkeley CIP Pile
Test
Berkeley
PLT test
|
Pile Load Test
3 PLT tests on 16" CIDH pier
Testing completed in 1 day
Conventional tests too costly |
-Allowed engineer to confirm frictional capacity of CIDH piers, substantially shortening pier and eliminated rock coring
-Time sensitive parking lot owned by others |
UC CAPITAL
IMPROVEMENTS |
|
KLEINFELDER |
UC BERKELEY REGENTS |
|
44.
Carpenters Hall
Oakland, CA
Tubex piles
|
40-ton to 120-ton piles on a confined site between unreinforced masonry building, hotel and Jack London Theater |
-Avoidance of vibration to brick building
-Avoidance of noise for motel and theater
-up to 50 ft pile lengths in 35'x100' site |
M.A. LINDQUIST |
FRATESSA
FORBES
WONG |
SUBSURFACE
CONSULTANTS |
JACK LONDON PROPERTIES CARPENTER'S LOCAL |
|
45.
Genentech Building 6
South San Francisco
Tubex piles
|
200-ton piles , rock socketed
for new structure adjacent to extreme - vibration sensitive equipment |
-Avoidance of all vibration mandated by adjacent research/genetic clean room
-comparable cost to HP-system
Ref: Genentech Test Program
|
McCARTHY |
RINNE
PETERSEN
|
BAY AREA
GEOTECHNICAL
GROUP
(BAGG) |
GENENTECH |
|
46.
Oakland International
Loading Docks Terminal 1
Oakland, CA
Tubex piles
|
50 -ton piles for new jetways in active operating terminal. Piles installed adjacent to operating gates and aircraft. |
-minimized height of piledriver
-satisfied safety concerns of passengers
and aircraft immediately adjacent to work
-design build project: coordinated with jetway manufacturer |
MONTEREY
MECHANICAL |
PGH WONG |
KLEINFELDER |
PORT OF OAKLAND |
|
47.
UCB Central Dining Hall
Cast-in-Place Pile Tests
Berkeley
PLT test
|
Pile Load Test
10 PLT tests on 24" & 30" CIDH piers
to confirm design assumptions of
large planned CIDH foundation
project |
-Allowed engineer to confirm frictional capacity of CIDH piers for significant foundation cost savings
-Provide static vs. PLT comparisons
-Analyzed by UCB geotechnical department |
UC CAPITAL
IMPROVEMENTS |
COMARTIN REIS |
RUTHERFORD &
CHEKENE |
UC BERKELEY
REGENTS |
|
48.
Moffet Field Warehouse
Test
Sunnyvale
PLT test
|
Pile Load Test
5 PLT tests on 14" PC piles to
confirm pile capacity
Conventional tests too costly
|
-Allowed engineer to confirm calculated capacity of driven piles |
STROER &
GRAFF |
CORP. OF ENGINEERS |
HARLAN TAIT
|
MOFFET NAS
NASA/AIMES RESEARCH |
|
49.
Jewel Box Building 4
Bay Meadows Mixed Use
San Mateo
Tubex piles
|
125 - 175 ton piles for new office
in area where zoning restrictions
prohibited piledriving. Bid against
drilled shafts on comparable scope. |
-Avoidance of disturbances mandated by zoning restrictions: no noise permitted
-Designed used two pile sizes and two
lengths to best optimize pile capacity vs. cost |
SWINERTON
BUILDERS |
NISHKIAN
MENNINGER |
HARZA |
PW ACQUISITIONS IV LLC |
|
50.
Oakland International
Restroom Upgrade
Terminal 1
Oakland International
Tubex pile
|
50 -ton piles for restroom expansion
in active operating terminal.
Piles adjacent to operating gates and
aircrafts.
|
-minimized height of piledriver
-satisfied safety concerns of passengers and aircraft immediately adjacent to work |
WEST COAST
CONTRACTORS |
PGH WONG |
KLEINFELDER |
PORT OF OAKLAND |
|
51.
Lakeshore Park
Concession Stand
San Mateo
Tubex piles
|
50 -ton piles for new CMU building
adjacent to bay in neighborhood
park.
40' bay mud at site |
-cost saving measure over CIDH: Tubex
as a design-build substitution for CIDH piles in bay mud.
-neighborhood area permitted no noise
|
COASTSIDE ASSOCIATES |
FORELL ELSESSOR |
KLEINFELDER |
CITY OF SAN MATEO |
|
52.
Equilon Refinery
CRU-2 Unit
Wilmington
Tubex piles
|
150 ton piles for new unit in tight
access around active and operating
refinery
Fundex PLT used to confirm pile capacity.
|
required; no swinging loads (safety)
-contaminated site: Tubex piles avoided spoil handling
-no vibration, high degree of control |
CHERNE
CONTRACTING
CORPORATION |
FLUOR DANIEL
|
URS DAMES & MOORE |
EQUILON (SHELL / TEXACO) |
|
53.
One Federal Street
San Francisco
Tubex piles
|
100 ton low overhead seismic upgrade
and conversation of warehouse as part of a large mixed-use development
Originally specified micropiles.
Tubex piles more cost effective. |
-Low-overhead conditions, with noise restrictions
inside concrete frame and masonry building
Tubex piles were rock socketed in
deeply striking bedrock contour.
Tubex achieved 40% higher capacity than micropiles |
BOVIS
LEND LEASE
CORPORATION |
INGRAM
DeJESSEE
ENGINEERS |
TREADWELL &
ROLLO
|
LENNOR BRANNON LLC |
|
54.
Kohl's Department Store
Seal Beach
Tubex piles
|
150 ton piles for new department store originally designed for driven precast piles. Selected for preferred foundation at a lower overall cost
Tubex piles more cost effective. |
-Site contaminated with PCE; Tubex grouted PCE insitu, with no drill spoil
-Tubex piles replaced precast piles 1:3, saving 2 weeks and at lower cost
- Load Tested to 750 kips with Fundex PLT |
OPUS WEST CONSTRUCTION |
AMROSSE
ENGINEERING
KKE Architects |
MT GEO
ENGINEERS, INC. |
KOHL'S DEPARTMENT
STORES, INC |
|
55.
Rincon Park
San Francisco
Tubex piles
|
90 ton piles for large statue monument on the Embarcadero of San Francisco.
Piles 125' long through deep bay mud, tipped in bedrock. Tubex pile Substituted for pipe piles for same cost, without nuisance noise |
-Piledriving allowed only off shift and partial shift.
Tubex piles installed normal shift working hours
-Safer operation with the ability to hydraulically hold long piles adjacent to Embarcadero traffic and bay walk pedestrian. |
WEBCOR BUILDERS |
KREYSLER &
ASSOCIATES INC. |
TREADWELL &
ROLLO |
GAP &
PRIVATE BENEFACTOR |
|
56.
Annacosta River-Benning
Road Bridge
Washington D.C.
Tubex piles
|
150 piles in moderate low overhead, used in lieu of designed drilled beam pile 70 ton piles tipped in marl.
Tubex used for better pile at lower cost.
|
-Washington metro immediately adjacent; no vibration permitted
-Tested per FHWA & AASHTO requirements
Load Test to 250 ton |
CORMAN CONSTRUCTION |
DC DOT |
DC DOT |
DC DOT |