Fundex Job List

 

SPECIALTY PILING PROJECTS
FUNDEX CIP CONCRETE PILES

PROJECT/
LOCATION

PILE APPLICATION/
STRUCTURE
Qty/Size/Capacity
BENEFIT/ADVANTAGE CONTRACTOR
STRUCTURAL
ENGINEER
GEOTECHNICAL
ENGINEER
OWNER

 

Mokelumne Aqueduct

Stockton, CA

Featured in ENR FEB. 1999 issue.

16" Fundex piles installed
adjacent to operating aqueduct
50 ton service load
load test to 100 tons with 1/4" deflection.

 

Avoidance of all vibration critical as aquaduct is main water supply for San Francisco bay area
25' deep cofferdam 40' piles in peat & sand
-Competitively bid against augercast
 
MOUNTAIN CASCADE, INC.







 
CH2MHILL








 
GEI








 
EBMUD
 







 
       

Glorietta Bay


Coronado, CA




 

16" Fundex piles for new community center and city hall. Designed for 70 ton service load, imbedded in hardpan bearing strata


 
Project bid as driven precast and Fundex as alternate. Owner choose Fundex for avoidance of piledriving noise and cheaper price. High water table and running sands precluded drilled shafts. 414 piles installed on average 18/shift PCL CONSTRUCTION








 
JOHN MARTIN & ASSOCIATES







 
KLEINFELDER









 
CITY OF CORONADO








 
       

Glorietta Bay Phase II

Coronado, CA



 

16" Fundex piles on beach for new community center's Olympic pool and pool building. Piles predrilled and imbedded 21ft into cemented sand bearing stratum. Owner sole-sourced Fundex after successful preformance of initial phase described above. Piledriving not permitted by noise restriction, high water table and running sands precluded drilled shafts. PCL CONSTRUCTION






 
JOHN MARTIN & ASSOCIATES





 
KLEINFELDER







 
CITY OF CORONADO






 
    

Marina Foods Store

San Mateo, CA


 

16" Fundex piles designed for 130kip capacity for grocery store expansion. Piles installed through bay mud to 43ft depth in bearing stratum. Project originally planned as precast pile job; redesigned to Fundex to avoid noise and vibration issuses with City and neighborhood community.
 
PINEWAVE CONSTRUCTION






 
DOMINIC CHU CONSULTING SE





 
KLEINFELDER







 
MARINA FOODS






 
 

Cal State University Long Beach
(CSULB) Parking Structure

Long Beach, CA

DSA REVIEW


 

16" Fundex pile for new parking structure. Piles installed through 50ft of loose silty sand, with high water table into dense sand bearing strata.





 
Competitively bid against drilled shaft design; awarded
based on cost, performance and avoidance of spoil.
Piledriving not permitted by noise restriction. Site
featured high water table and running sands.
PDA Tests confirmed  550 to 850 kips capacity
 
BOMEL CONSTRUCTION












 
WATRY DESIGN GROUP











 
KLIENFELDER













 
CALIFORNIA STATE UNIVERSITY











 
 
2200 Mission St 

San Francisco, CA



 
16" Fundex piles designed for 120 kips
adjacent to BART tunnel. 
Building to be retail at street level and
residences above

 
Piledriving not allowed close to BART tunnel due to
vibration concerns. 14" PC piles driven elsewhere
onsite


 
EICON








 
SANTOS & URUTIA







 
HAROLD LEWIS








 
HAROLD H. HGO







 
 

555 Mission


San Francisco, CA

 

16" Fundex piles in lieu of 14" concrete piles
as a one for one replacement
Office building

 
Used fundex piles adjacent to existing building to
avoid damage to building and disruption to people
in building.
 
TURNER CONSTRUCTION





 
MIDDLEBROOK & LOUIE





 
TREADWELL & ROLLO





 
TST MISSION ST LLC