Concrete Piles

Pre-cast or pre-stressed concrete piles are one of the most commonly used concrete piles.  More than 40% of our jobs involve concrete piles due to their relatively low material cost, custom lengths and ready availability.

The cost of concrete pile can be varied based on design loads, dimensions and length required; getting the load bearing capacity needed without costly material waste.  Additionally concrete piles can be ready to drive in 14 days, as opposed to steel piles which can take from 6-8 weeks to receive from a mill.

Our experience and knowledge of soil mechanics and job requirements help our clients save time and money and can help avoid costly delays.